Latest News:
2010/03/30 McQuay International Earns ISO 14001:2004 Certification2009/12/08 Daikin McQuay Pathfinder Chiller Now Available with Optional VFD!
2009/10/13 Daikin McQuay Magnitude™ Frictionless Centrifugal Chillers Now in 400 to 550 Tons!
2009/06/29 New Daikin McQuay Pathfinder™ air-cooled chiller helps reduce energy costs, meet sustainable goals.
2009/02/17 New McQuay Extended-Size Vision™ Indoor Air Handlers
2008/11/20 New Scroll Templifier™ Water Heater
2008/11/20 McQuay Equipment Quiet Enough for “On Air”
2008/04/09 The International Mechanical Code and ANSI/ASHRAE Standard 62.1-2004
Colleges and Dormitories

- Flagler College - A Positive Owning Experience Video -10,793KB
A 3:55-minute video highlighting the efficiency, quiet operation and reliability of the Frictionless Chiller installed in Kenan Hall at Flagler College in St. Augustine, Florida. Features customer testimonial by the owner. Best viewed with Windows Media® Player version 9.0 or higher.
- Flagler College - Frictionless Chillers (04/07) -437KB
Historic Flagler College in St. Augustine, Florida installed two McQuay frictionless compressor chillers as part of a recent HVAC system renovation. The result was energy and maintenance cost savings, as well as a more quiet environment for students. Article used by permission of Engineered Systems magazine.
- Florida Community College at Jacksonville - FrictionlessChiller (03/08) -2,351KB
Florida Community College upgrades to McQuay frictionless Model WMC chiller for energy savings and quiet learning environment
- Frictionless Chiller - Multi-Use Office Bldg - University of Minnesota Alumni Center (01/08) -1,840KB
University of Minnesota 231,00-sq ft Alumni Center saves $13,000 in annual utility costs with 300-ton Frictionless chiller. Chiller communicates with Johnson Controls Metasys® building automation system using BACnet® protocol.
- Frictionless Chiller at University of Calgary - LEED® Platinum Building (03/08) -1,346KB
McQuay Frictionless Chiller's efficiency helps the University of Calgary's Child Development Centre earn LEED Platinum certification from USGBC. This case study originally appeared in Sustainable Architecture and Building magazine.
- McQuay Frictionless Chiller Cools Campus Showplace at Cal State University -327KB
McQuay Frictionless chiller cools the renovated Acacia Court building at the California State University, Stanislaus-Stockton, improving energy efficiency and quiet operation.
- Pima Community College MCP Case Study, 2F-4073 -486KB
After replacing two 35-year old chillers and a boiler with a McQuay Modular Central Plant, Pima Community College estimates that it will save 40% in overall energy costs for heating and cooling. More classroom space and a utility rebate were added benefits of the HVAC project. Literature order number 2F-4073.
- PTAC - Educational Housing -149K
McQuay "K" Style PTACS Are A Lesson In Comfort For The Dorms
- Qatar's Education City Chooses McQuay WSC Chillers -510K
Eleven 1000-ton McQuay WSC centrifugal chillers provide cooling for the Education City campus in Doha, Qatar
- Regents Hall at St. Olaf College combines sustainable design, interdisciplinary science education -400KB
Designed for LEED Platinum certification